Skip to content
  • There are no suggestions because the search field is empty.

How do I "sign-off" a Preventive Maintenance Requirement?

Log completed Preventive Maintenance from the Maintenance Logs tab by selecting the PM action. AlarisPro provides a UAS Maintenance Guide in the Help tab to supplement OEM PM information.

1. Add the date the maintenance was performed and select the UAS. 2. Select the Preventive Maintenance performed (PM1, PM2, PM3, or PM4) from the Maintenance Action dropdown. 3. Add Remarks (required) describing what was done. 4. State airworthiness status and select "Add Log".